DataCentral
Stephen Moore
No ratings yetUtilitiesAges 4+
Screenshots
About this app
DataCentral is the app for watching the US AI data center race — from Stargate-scale campuses and xAI's Colossus to the grid strain the buildout is creating. We don't pretend other companies' sites are live. Follow the buildout (free) - Buildout Pulse — sourced stories of announcements, milestones, and grid news, each with a source and an as-of date. - The Race — leaderboards ranking builders, states, and campuses by announced gigawatts. First open sets an overnight baseline rather than inventing climbers. Share a leaderboard card in a tap. - Grid — a three-state teaser ranked by the registry model, labeled "not live EIA," with MW announced and AI announced. Pro unlocks live EIA ranking. - Catalog — nationwide facilities with announced MW. Online and Building are registry status, not live health. - Your State — pick a state for its EIA residential electricity rate (labelled with the month published) shown beside announced facility MW and public proceedings. The app does not attribute rate changes to data centers. - Home Screen widgets — tracked announced capacity and the latest headline, updated in the background from a local snapshot. - One custom site to track your own facility manually. DataCentral Pro - Live facility telemetry — connect your own sites via HTTPS you supply and stream live power, utilization, and status on a real poll cadence. - Live EIA ranking — full state grid ranking from EIA-930, not the free registry teaser. - Assistant — ask about your watches, Race ranks, Grid, and Time to Power. Answers are grounded in data already in the app. - Unlimited custom data centers, with status/grid alerts and a "My Site" widget. - Energy cost modeling with customizable $/kWh. - Predictive insights and infrastructure alerts. - Annual plan includes a 7-day free trial. Honest data labeling - Cover copy states we don't pretend other companies' sites are live. - Pulse cards carry a source and an as-of date (for example "Updated Aug 27, 2026"). - Race ranks announced GW. Overnight Moves starts as a baseline on first open. - Free Grid is the registry model, labeled not live EIA. Rows read MW announced / AI announced. - Catalog MW is Announced. Online / Building are registry status, not live health. - Connected sites you instrument are badged LIVE with a last-updated timestamp. - Live telemetry requires a metrics endpoint you control (or a gateway you deploy). Who it's for - Investors and analysts tracking the US AI infrastructure buildout. - Enthusiasts following Stargate, Colossus, and the gigawatt race. - Infrastructure engineers and operators monitoring their own facilities. Subscription required for live connections, live EIA ranking, Assistant, and other Pro features. The Race, Pulse, registry Grid teaser, nationwide catalog, and manual custom sites remain available without a subscription.
What's new
Version 1.3.9 · Oct 6, 2026
• New: a Texas permit pause card on Texas campuses, counting down to Oct 12, Oct 19 and Dec 10, with a source link for each date • Every Texas campus shows "TX permit: Unknown" until a dated source exists • The listed dates are deadlines, not an end date, and the pause has no stated expiration
In-app purchases
The most popular purchases on the App Store.
- DataCentral Pro AnnualSubscription · 7 days free trial$1,799.00 / year
- DataCentral Pro MonthlySubscription · 3 days free trial$199.00 / month
You might also like
Cookies - Count AnythingPhilipp Tschauner
Link Widget - Quick Access WebJens Rieckhof
TunnelX - Fast Private ProxyNsfocus
PosterMap: Custom Map MakerAli Goktas
Conversor de tiempo - Timeconkota tada
Crit Happens: Dice RollerJonathan Peacher
Led Banner Free -of AdsTERMUX LIMITED LIABILITY COMPANY
OllamaChat AISG1 Labs LLC
石油计算器昆 张
Basic Calculator.Edison Largo